Supply continuity for horseshoe programs

Horseshoe Supply and Delivery Planning

Plan delivery from your required arrival date, then work back through packing, transport and production. Send the model and size quantities with the destination and receiving requirements. Any overseas stock or warehouse option must be confirmed for the actual item, quantity and location; this page is not a live inventory listing.

Production timing

Plan production and transport as separate stages

Share the target arrival window and quantities by size. We review the approved product reference, any sample work and the packing requirements before confirming the production schedule. Shipping and destination handling are separate parts of the plan.

Inventory states

Use precise stock language

Planned production

Goods are scheduled against an approved specification and order.

Ready or in transit

Only identified SKUs, quantities and shipment records count as committed supply.

Destination stock

Warehouse availability is confirmed for the current location, product and commercial terms.

Delivery brief

Five inputs create a usable logistics plan

On a small screen, swipe the table sideways to see all columns.

InputWhy it matters
Models, sizes and quantitiesDefines production and carton mix
Required arrival windowSeparates production time from transport time
Destination and receiving limitsShapes freight and delivery options
Pack, pallet and label requirementsPrepares the goods for the buyer’s warehouse
Requested IncotermClarifies cost and responsibility boundaries

Replenishment design

Protect the sizes that stop sales when they run out

Identify the models and sizes that need regular replenishment, then separate them from occasional orders. Confirm minimum quantities and the current schedule by item. Your own sales pattern and agreed supply timing should guide the stock you choose to hold.

Confirm the handover points in the delivery plan

Keep the planned production completion, shipment arrangement and destination receiving window distinct. State the delivery term and named place so both teams understand the proposed handover and which costs are included.

Before shipment, check the packing list against the size breakdown and tell us about pallet, unloading or label requirements. Update the plan if the approved product, artwork or quantities change.

Factory review

Create a realistic supply calendar

Send the SKU forecast, destination, required arrival window and packing requirements. We will align the production and delivery discussion.